- CRL Air sampling team and water sampling team arrived on site last June 16 and June 18, respectively.
- Air quality samples collected from 5 different sites. Sampling completed last June 22.
- Water quality samples collected from 14 different sites. Sampling completed last June 20.
- Collected air (5) and water (14) samples were successfully delivered to the CRL laboratory in Pampanga within the required 24-hour period.
- CRL water sampling team and air sampling team left site last June 20 and June 22, respectively.